Deliverable Number | Deliverable Title | Nature | Dissemination level | Delivery date | Download |
---|---|---|---|---|---|
D1.1 | Quality Assurance Plan | R | PU | 3 | Available |
D2.1 | Preliminary design of the mechanical parts | O | CO | 3 | Confidential |
D2.2 | Requirements for the new sensors for shoot portions and for soil-root portions | R | PU | 4 | Available |
D2.3 | Design of the new sensors | O | CO | 8 | Confidential |
D2.4 | Technical specification for the power system with solar panels | R | PU | 10 | Available |
D2.5 | Technical Specifications for the new LED Lamps | R | CO | 9 | Confidential |
D2.6 | Technical specification for the communication and control system | R | PU | 12 | Available |
D3.1 | New Growth protocols | R | CO | 6 | Confidential |
D3.2 | Intermediate report on growth tests | R | PU | 18 | Available |
D3.3 | Final report on growth tests and biological validation | R | PU | 35 | Available |
D4.1 | Final design of the Growth Chamber (mechanics and water) | O | CO | 14 | Confidential |
D4.2 | New LED lamps built and tested | O | CO | 15 | Confidential |
D4.3 | New sensors built and tested | O | CO | 18 | Confidential |
D4.4 | Control, communication and monitoring system | O | CO | 20 | Confidential |
D4.5 | Robotic devices | O | CO | 19 | Confidential |
D4.6 | Power system with solar panels | O | CO | 21 | Confidential |
D4.7 | Report on completed development of tecnical components | R | CO | 22 | Confidential |
D5.1 | New growth chamber assembled with all the devices integrated | P | CO | 25 | Confidential |
D5.2 | User's manual | O | PU | 31 | Available |
D6.1 | Report on the technical validation | R | PU | 29 | Available |
D7.1 | Project Web site | O | PU | 3 | You are here! |
D7.2 | Market analysis | O | PU | 30 | Available |
D7.3 | Proceedings from Workshop1 | R | PU | 12 | Available |
D7.4 | Proceedings from Workshop2 | R | PU | 21 | Available |
D7.5 | Proceedings from Workshop 3 and and report on the participation at an international fair | R | PU | 33 | Available |
D7.6 | Articles and peer-reviewed papers | R | PU | 34 | Available |
D7.7 | Industrial Implementation Plan and Plan for the organisation of the Distributed Company | O | CO | 34 | Confidential |
D7.8 | Plan for use and dissemination of the foregrond | R | CO | 12 | Confidential |
D7.9 | Policy brief with a synthesis of policy relevant results from the project | R | PU | 35 | Available |